Reconstruction Stadtschloss
Stadtschloss
Berlin | Germany
Holes: 100x 100 meters
Total drilling meters: 10.000
Realization: 2019 – 2021
Pressing with Fischer GeoSolid® 240HS
SKA Square Kilometre Arry
SKA Square Kilometre Arry
Murchison | Australia
Holes: 96x 125 meters
Total drilling meters: 12.000
Realization: June 2011 (construction phase)
Pressing with Fischer GeoSolid® 240HS
L’Oréal Paris
L’Oréal
Paris | France
Holes: 36x 190 meters
Total drilling meters: 6.840
Realization: July 2019 (1st construction phase)
Pressing with Fischer GeoFlow®
Reconstruction terminal
Airport Genf
Genf | Swiss
Holes: 70x 285 meters
Total drilling meters: 19.950
Realization: September 2018 – March 2020
Pressing with Fischer GeoFlow®
Schloss Herrenchiemsee
Schloss Herrenchiemsee
Germany
Holes: 16x 250 meters
Total drilling meters: 4.000
Realiazation: April 2010
Pressing with Fischer GeoSolid® 240HS
Hilton Hotel
Hilton Hotel
Belgrad | Serbia
Holes: 70x 100 meters
Total drilling meters: 7.000
Realization: Summer 2016
Pressing with Fischer GeoSolid® 240HS
Silvretta-Therme
Silvretta-Therme
Ischgl | Austria
Holes: 26x 300 meters
Total drilling meters: 7.800
Realization: 2019 / 2020
Reconstruction Continental headquarter
New building Continental-Zentrale
Hannover | Germany
Holes: 85x 100 meters
Total drilling meters: 8.500
Realization: 2019 / 2020